20-ton Packaged Rooftop Unit Installation

This challenging installation of a 20-ton packaged rooftop unit in downtown Columbus required the removal of tall iron fencing aroung a patio to allow room for the staging of the installation, equipment and crane. Through thoughtful planning, AireCom was able to prepare the area for a successful and safe cranelift by avoiding any close proximity to overhead power lines.